Your BEP becomes the rules
How bimai reads the BIM execution plan and turns it into the project's configuration.
Not built yet
Planned for v0.1. This page describes the target experience; commands may not exist yet.
The BIM execution plan is where a project's agreements live. bimai reads it at the start of the project so the agents follow what was actually agreed.
What it picks out
| Topic | Example | Used for |
|---|---|---|
| Roles and responsibilities | The BIM coordinator owns clash coordination | Positions and who owns what |
| Software and versions | Revit 2025, Civil 3D 2025, OpenRoads Designer 2023 | Connections and version checks |
| CDE and statuses | ACC, status codes S0–S4 | Delivery checks |
| Naming | <project>-<originator>-<zone>-<level>-<type>-<role>-<number> | Naming checks |
| Model breakdown | Federated models per discipline and zone | Who owns which part |
| Exchange formats | IFC 4.3, BCF | Export checks |
| Classification and LOD/LOI | NL-SfB, OTL, LOD per phase | Model checks |
| Coordinates | RD New, NAP | Model checks |
| Coordination rhythm | Clash session every other Tuesday | Workflows and deadlines |
| Milestones | DO-freeze 1 March | Planning and reminders |
You check it first
Every extracted agreement comes with the page and section it came from and how sure bimai is. Anything unclear becomes a question instead of a guess:
The BEP names two versions of Civil 3D (2024 and 2025). Which one is leading?Nothing is applied until you've reviewed it.
After that
- The BEP is the baseline. Deviating from it needs a logged decision that refers to the section.
- New BEP revision?
bimai bep importreads it;bimai bep diffshows what changed and proposes updates for the rule owners to approve. - Wrong software version?
bimai doctorwarns when your installed Revit differs from the agreed one, before you save a model in the wrong version.