Design coordination

Requirements, risks and planning from your Relatics and Primavera or MS Project exports.

Not built yet

Planned for v0.1. This page describes the target experience; commands may not exist yet.

No live connection to Relatics or Primavera is needed. You export the files as you do today and give them to bimai.

Add your exports

bimai data import exports/relatics-2026-09-26.json
bimai data import planning/DO-planning-v14.xml

Or drop them into the project's inbox folder. Supported: Relatics JSON exports, Primavera P6 XML and MS Project XML. The first time, bimai proposes how the Relatics fields map to requirements, risks and verifications; you confirm it once.

Every import is kept as a dated snapshot, so bimai can show trends and answer "what changed since last week?" (bimai data diff relatics --since last-week).

What you can ask

  • "Which requirements for the viaduct aren't verified yet and are due before DO-freeze?"
  • "What risks could hit the permit milestone?"
  • "Draft this week's design progress report."

Ready-made reports

ReportWhat it shows
Requirements statusVerification coverage per discipline and phase; requirements without a method or owner
Risk reviewTop risks, overdue mitigations, risks tied to upcoming milestones
Schedule healthCritical path, slipping milestones, deliverables due in the next four weeks
Design progress reportThe three above in one weekly report, with trends
Cross-checkDeliverables due soon whose requirements have no verification plan

Reports always state how old the data is, and you're reminded when an export is out of date.